Historic Structure Report              Santa Fe Station                             413 East 7th Street

December 2, 2009                                                                          Lawrence, Kansas

 

 

Table of Contents

Introduction

Study Summary................................................................................................. 1-2

Project Data..................................................................................................... 3-6

 

Part 1 - Developmental History

Historical Background and Context........................................................................ 7-9

Physical Description, Chronology of Development, and Evaluation of Significance....... 10-12

 

Part 2 – Treatment and Work Recommendations

Historic Preservation Objectives............................................................................ 13

Requirements for Work................................................................................... 13-14

Condition Assessment and Work Recommendations.............................................. 14-40

Site................................................................................................. 15-18

Building Shell..................................................................................... 18-22

Interior:

Code.......................................................................................... 23-24

Accessibility................................................................................. 24-25

Waiting Room.............................................................................. 26-27

Vestibules (2 & 3)......................................................................... 27-30

Ticket Office................................................................................ 30-32

Passage...................................................................................... 32-33

Boiler Room, Bathrooms, Janitor, and Agent’s Office........................... 33-34

File Storage.................................................................................. 34-35

Baggage Room............................................................................. 35-36

Freight Office............................................................................... 36-38

Vestibule (14)................................................................................... 38

Mechanical........................................................................................ 39-40

Probable Cost Projection with Priorities and Work Types......................................... 1-10

Probable Cost Projection with Line Items Expanded................................................ 1-12

 

Appendices

A:  Location Map, Aerial Photos, Transportation 2030: Bikeway System Map (partial)

B:  Structural Report

C:  Mechanical Report

D:  Lead-based Paint Report

E:  Original Construction Drawings

F:  Concept Drawings for Work Recommendations

G:  Historic photographs

H:  Current photographs

I:   “The Santa Fe Station in Lawrence, KS: Its Cultural Context, Modern Design, and Significance”

J:   Amtrak Expansion Feasibility Study

K:  Secretary of the Interior’s Standards for Preservation and Guidelines for Preserving Historic Buildings

L:  Bibliography

Table of Contents