Walnut
Street repaved from 4th Street to 7th Street 




Replaced Curb
and gutter at


Installed
ramp at W. 2nd and

Concrete
repair on Natalie Drive



Installed new
ramp and remedied tripping hazard at 1020 Massachusetts Street



Base and curb
repaired at 1805

Installed
valley gutter at

Haskell Avenue milled
and overlaid from 15th St to 23rd St


