Project: 19th and
·
Widen
·
Widen
·
Install/construct bus turnout on
|
|
Description |
Quantity |
Units |
Unit
Price |
Total
Price |
|
1 |
Clearing &
Grubbing |
1 |
L.S. |
$ 5,000.00 |
$ 5,000.00 |
|
2 |
Removal of
Existing Structures |
1 |
L.S. |
25,000.00 |
25,000.00 |
|
3 |
Unclassified
Excavation |
900 |
C.Y. |
15.00 |
13,500.00 |
|
4 |
Type B
Compaction (MR-90) |
350 |
C.Y. |
9.00 |
3,150.00 |
|
5 |
Milling |
6,500 |
S.Y. |
40.00 |
26,000.00 |
|
6 |
6” AB-3 Base |
1,100 |
S.Y. |
16.00 |
17,600.00 |
|
7 |
8” Concrete
Pavement for Widening (A.E.) |
700 |
S.Y. |
65.00 |
45,500.00 |
|
8 |
2” Asphalt
Overlay (BM-2) |
800 |
Tons |
60.00 |
48,000.00 |
|
9 |
4” Concrete
Pavement (Reinforced)(A.E.) |
500 |
S.Y. |
50.00 |
25,000.00 |
|
10 |
6” Concrete
Pavement (Reinforced)(A.E.) |
500 |
S.Y. |
45.00 |
22,500.00 |
|
11 |
Concrete Curb
and Gutter (A.E.) |
3,000 |
L.F. |
20.00 |
60,000.00 |
|
12 |
Concrete
Sidewalk (4”)(A.E.) |
550 |
S.Y. |
29.00 |
15,950.00 |
|
13 |
Access Ramp |
12 |
Each |
2,000.00 |
24,000.00 |
|
14 |
Std. Curb Inlet
(Precast) |
2 |
Each |
3,500.00 |
7,000.00 |
|
15 |
15” Storm Sewer
(RCP) |
20 |
L.F. |
200.00 |
4,000.00 |
|
16 |
Relocate Fire
Hydrant |
2 |
Each |
2,000.00 |
4,000.00 |
|
17 |
Signal |
1 |
L.S. |
200,000.00 |
200,000.00 |
|
18 |
Pavement
Markings |
1 |
L.S. |
10,000.00 |
10,000.00 |
|
19 |
Traffic Control |
1 |
L.S. |
12,000.00 |
12,000.00 |
|
20 |
Construction
Staking |
1 |
L.S. |
9,000.00 |
9,000.00 |
|
21 |
Seeding,
Fertilizing and Mulching |
1 |
L.S. |
5,000.00 |
5,000.00 |
|
22 |
Mobilization |
1 |
L.S. |
12,000.00 |
12,000.00 |
|
Subtotal |
|
$
594,200.00 |
|||
|
20% Contingency |
|
120,000.00 |
|||
|
|
|
$ 715,000.00 |
|||
|
Preliminary
Engineering/Construction Engineering |
|
75,000.00 |
|||
|
|
|
$ 800,000.00 |
|||