Wakarusa Water Reclamation Facility

Overview | Community Involvement | FAQ | Contact US | Links

Public Advisory Committee
Introductory meeting agenda

Date: November 3, 2005
Time: 7:00 to 8:30
Location: Commission Chambers

(City) Introductions  10 min

(B&V) Project Team  10min

  • City Staff
    • End user of facility
  • Public Advisory Committee
    • Conduit for public input
    • Engagement through the evaluation process
  • Black & Veatch
    • Technical Consultant for wastewater collection & treatment
  • Patti Banks Associates
    • Outreach coordinator
  • Bartlett & West
    • Surveying
  • HNTB
    • Permitting
  • General population at large
    • Input on acceptability, site utilization, & aesthetics

(B&V) Wastewater 101  15 min

  • General wastewater treatment review
  • Wastewater treatment plant vs. water reclamation facility
  • Review role of the collection system
  • Typical concerns
    • Odor
    • Aesthetics
    • Noise
    • Lighting
    • Truck traffic
    • Residuals disposal
    • Other?

(B&V/PBA/HNTB/B&W) Project Overview  
20 min

  • Need for Wakarusa Water Reclamation Facility (B&V)
    • Horizon 2020/Land use plan
    • Master Plan Recommendations
    • Growth Rate is Exceeding Population Projections
    • Timeline
  • Requirements and considerations (B&V/HNTB)
    • No preconceived locations
    • Accommodate gravity flow to the extent possible
    • Existing constraints
      • Existing collection system
      • Wetlands
      • Cultural & historic locations
    • Engineering issues (B&V/HNTB/B&W)
      • Can't build in floodway
      • Floodplain considerations
      • Environmental permitting
      • Site geology
      • Site topography
      • Proximity to utilities
      • Proximity to roadways
      • Affordable w/in rate plan

(B&V/PBA) Introduction to Process  15 min

  • Public input into criteria for selection (B&V/PBA)
    • Public acceptability factors
    • Site utilization
    • Appearance
  • Stakeholder Public Advisory Committee (PAC) (PBA)
    • Engaged with project team throughout the process
    • May be requested to stay with team through 2011
  • Stakeholder Interviews (PBA)
    • Currently being scheduled/conducted
  • Peer Group Roles (B&V)
    • Peer group qualifications
  • Description of Process (PBA)
    • Stakeholder Interviews
    • Workshops
    • Public meetings
  • Process timeline (B&V)