Executive Summary 2009
6 East 6th Street
Description: Exterior is brick. Interior is sheetrock and metal studs. 154 feet long and 82 feet high. 36,000 sq. ft.
Year Constructed: Dedicated August 23, 1980
Current Appraised Value: $5,872,950.00 ($2,260,240.00 Land, $3,612,710.00 improvements)
Condition Report: City Hall is in good overall condition. The slate roof needs attention to prevent deterioration of the structure.
Completed Improvements
1997
- Remodeled planning offices, incorporating the Mayors office, $24,600.00
- Waterproofing and tuck-pointing the exterior of City Hall, $47,000.00
1999
- Replaced the rooftop units, installed DDC control system, upgraded the electrical system to support improvements to the HVAC system
- Replaced roof with white reflective membrane, $62,709.00., Boone Brothers 12 yr. warranty
- Restroom renovations on 3rd and 4th floor $51,280.00., B.A. Green construction
- City commission room remodeled $52,032.00
2000
- Remodeled Personnel Department on 2nd Floor, $38,000.00
- Remodeled 1st and 2nd floor restrooms, $56,886.00
- Phase 2 HVAC renovations: VAV, ductwork and electrical upgrades for $256,282.00
2001
- Remodeled ground floor restrooms, $32,051.00
- Phase 3 HVAC renovations: VAV, ductwork and electrical, including lighting upgrades for ground floor; electrical upgrades 2nd floor, $248,960.00
2002
- Phase 4 A/C renovation/replacement of 1st floor VAV system including ductwork, installation of DDS controls, and extension of building electrical including lighting system to support changes, $153,900.00
- Upgrade City Commission room lighting for an 80% reduction in energy consumption
2005
- Phase 5 A/C renovation/replacement of 4th floor VAV system including ductwork, installation of DDC controls, extension of building electrical including lighting system to support changes, $320,000.00
2008
- Started the installation of occupancy sensors in offices, restrooms and meeting rooms
Energy Conservation Efforts
- Replaced roof top units, incorporated variable speed drives, multi-phase project, 1999-2004
- Replaced pneumatic controls with computer operated system to give better control of energy usage, 2004
- Replaced fluorescent F-40 lighting with electronic T-8 ballasts and bulbs
- Replaced lighting in City Commission room with energy efficient lighting saving approximately 80 percent energy, 2003
- Using recycled content carpet
- Installed reflective material on windows, 2001
- Set temperature controls for building at 68 in the winter and 78 in the summer
- In the process of replacing operable windows in City Hall with weather double pane low E argon gas filled windows
- Installing motion and infrared detectors for lighting controls
- Set up recycling center on ground floor for: white paper, mixed paper, newspapers, magazines, plastic, and glass
Needed Improvements
- Replace or repair slate roof
- Exterior windows need to be caulked and sealed
- Auxiliary warm up heat for the City Commission room
- Additional storage space
Needed Energy Efficiency Projects
- Replacement of all windows
- Replace atrium windows
- Roller blinds in atrium
Energy Costs History
|
2007 |
2008 |
Gas |
$1,497.53 |
$3,462.79 |
Sq. ft. |
00.04 |
00.10 |
Electric |
$52,698.62 |
$57,638.60 |
Sq. ft. |
01.46 |
01.60 |
Heating degree days |
6949 |
5770 |
Cooling degree days |
1701 |
1173 |
Natural Gas Usage |
||||||||||||
|
Jan |
Feb |
Mar |
April |
May |
June |
July |
Aug |
Sept |
Oct |
Nov |
Dec |
2007 |
130 |
210 |
85 |
76 |
54 |
58 |
59 |
0 |
112 |
91 |
91 |
221 |
2008 |
236 |
548 |
536 |
340 |
97 |
71 |
51 |
51 |
63 |
113 |
164 |
797 |
Natural Gas Usage |
||||||||||||
|
Jan |
Feb |
Mar |
April |
May |
June |
July |
Aug |
Sept |
Oct |
Nov |
Dec |
2007 |
130 |
210 |
85 |
76 |
54 |
58 |
59 |
0 |
112 |
91 |
91 |
221 |
2008 |
236 |
548 |
536 |
340 |
97 |
71 |
51 |
51 |
63 |
113 |
164 |
797 |