Stormwater project list
Construction Projects
Publicly funded stormwater projects completed since 1996 and planned for the future...
Quick List (click on the location for more information)
| Complete | Location | Total Cost | Source |
|---|---|---|---|
| 1996 | 4th and Minnesota | street project | Master Plan Group 3 #18 |
| 1997 | 8th and Tennessee | $347,511 | inspection / maintenance |
| 1997 | North 8th, Ash to Walnut | City crew | inspection / maintenance |
| 1997 | North 2nd, Lyon to Lincoln | $77,050 | inspection / maintenance |
| 1998 | 8th and Monterey Way | City crew | Engineering |
| 1998 | Dub's Court | City crew | inspection / maintenance |
| 1998 | 3rd and Michigan | $1,435,472 | Master Plan Group 1 #17 |
| 1998 | Carolina, 21st to 23rd | $2,564,139 | Master Plan Group 1 #9 |
| 1998 | Medina Road | City crew | Master Plan discretionary |
| 1999 | Deerfield Creek, Creekwood | $634,760 | Master Plan discretionary |
| 1999 | North Crestline at Stowe | $45,142 | Engineering |
| 1999 | 234 North 8th | $86,000 | City Commission |
| 1999 | 29th Court | $25,090 | Master Plan Group 1 #6 |
| 1999 | 9th, Vermont to New Hampshire | $463,416 | Master Plan Group 1 #26 |
| 1999 | Quail Creek Watershed Study | City staff | City Commission |
| 1999 | 14th Court at Monterey Way | $51,929 | Engineering |
| 2000 | Hallmark channel | City crew | inspection / maintenance |
| 2000 | North and North 5th | City crew | inspection / maintenance |
| 2000 | 8th and Pennsylvania | $61,824 | Master Plan discretionary |
| 2000 | 6th Street, High Pointe | $36,197 | Engineering |
| 2000 | Eldridge and Trail | City crew | inspection / maintenance |
| 2000 | 7th and Michigan | $72,584 | Master Plan Group 3 #21 |
| 2000 | Yorkshire Drive | City crew | Master Plan discretionary |
| 2000 | 8th and Connecticut, Phase 1 | $125,418 | Master Plan Group 3 #25 |
| 2001 | 8th and Connecticut, Phase 2 | $84,154 | Master Plan Group 3 #25 |
| 2001 | Kasold at Meadow Place | City crew | Master Plan discretionary |
| 2001 | Four Wheel Drive | City crew | inspection / maintenance |
| 2001 | 1205 Brook | $90,925 | City Commission |
| 2001 | Yankee Tank East Hydraulic Study | $15,076 | City Commission |
| 2002 | Illinois at 7th | City crew | inspection / maintenance |
| 2002 | Montana Street | $32,965 | inspection / maintenance |
| 2003 | North Michigan Culvert | street project | Master Plan Group 3 #19 |
| 2003 | 21st, Stewart to Naismith Drive | $1,774,000 | Master Plan Group 1 #10 |
| 2003 | Belle Haven, 27th to 29th Terr | City crew | Engineering |
| 2003 | 27th to Saratoga | $220,182 | Master Plan Group 3 #14 |
| 2004 | 21st, Kentucky to Barker Court | $2,590,000 | Master Plan Group 1 #29 |
| 2004 | 8th and Maine | City crew | inspection / maintenance |
| 2004 | 27th to Four Wheel Drive | City crew | inspection / maintenance |
| 2005 | 13th and Oregon | $3,900,000 | Master Plan Group 1 #28 |
| 2005 | Ridge Court | City crew | Master Plan Group 1 #7 |
| 2005 | 15th and Lawrence Ave | pending | Master Plan discretionary |
| 2005 | Haskell Basin | pending | KDOT grant |
| 2005 | North Lawrence Drainage Study | $282,333 | City Commission |
| 2005 | 2004 Misc Improvements | pending | Engineering |
| future | Alabama, 17th to Naismith Drive | - | Master Plan Group 1 #11 |
| future | Maple Lane, 19th to Brook | - | Master Plan Group 1 #34 |
| future | 16th, Kentucky to New Hampshire | - | Master Plan Group 1 #32 |
| future | 23rd & Ousdahl | - | Master Plan Group 2 #8 |
| future | 8th and Ohio | - | Master Plan Group 2 #23 |
| future | Stadium to 9th and Mississippi | - | Master Plan Group 2 #24 |
| future | 6th and Arkansas | - | Master Plan Group 2 #20 |
| future | 19th, Kentucky to Learnard | - | Master Plan Group 2 #30 |
| future | 15th and Iowa West | - | Master Plan Group 2 #4 |
| future | 23rd and Haskell West | - | Master Plan Group 2 #16 |
| future | 12th and Kentucky to 8th and Tennessee | - | Master Plan Group 2 #22 |
| future | North 2nd, Turnpike to North Street | - | Master Plan Group 2 #40 |
| future | 8th / 9th and Holiday | - | Master Plan Group 3 #2 |
| future | Crestline and Westdale Culverts | - | Master Plan Group 3 #3 |
| future | 13th and Brook Culvert | - | Master Plan Group 3 #33 |
| future | 22nd to 23rd Street 1400 West | - | Master Plan Group 3 #12 |
| future | 26th Street 2300 West | - | Master Plan Group 3 #13 |
| future | Indian and Massachusetts | - | Master Plan Group 3 #15 |
| future | Lawrence Avenue, 6th to Harvard | - | Master Plan Group 3 #5 |
| future | 14th and Massachusetts East | - | Master Plan Group 3 #27 |
| future | 5th and Lyon to Levee | - | Master Plan Group 3 #37 |
| future | 8th and Maple to Levee | - | Master Plan Group 3 #38 |
| future | 5th and Elm to Levee | - | Master Plan Group 3 #39 |
| future | 7th and Elm to Levee | - | Master Plan Group 3 #41 |
| future | 15th, Summit to Prairie | - | Master Plan Group 3 #35 |
| future | 19th and Haskell North | - | Master Plan Group 3 #31 |
| future | 15th Street 3500 West | - | Master Plan Group 3 #1 |
| future | East 19th Street Culvert | - | Master Plan Group 3 #36 |
| future | Sherwood Drive | - | Master Plan discretionary |
| future | Trail and Cattleman | - | Master Plan discretionary |
| future | 2nd and Iowa | - | Master Plan discretionary |
| future | 4th, Maine to Indiana | - | Master Plan discretionary |
| future | Harvard and Crestline | - | Master Plan discretionary |
| future | Avalon and Cambridge | - | Master Plan discretionary |
| future | 11th and Rhode Island | - | Master Plan discretionary |
| future | 11th and Ohio | - | Master Plan discretionary |
| future | 17th and Barker | - | Master Plan discretionary |
| future | 21st and Maple | - | Master Plan discretionary |
| future | Crestline Court | - | Master Plan discretionary |
| future | Dakota, Nebraska | - | Master Plan discretionary |
| future | Ponderosa at Trail Dust | - | Master Plan discretionary |
| future | Arrowhead and Peterson | - | Engineering |
| future | Stetson and Tumbleweed | - | Engineering |
| future | Freedom Hill Court | - | Engineering |
| future | University and Stratford | - | Engineering |
Expanded List
| Location: 4th and Minnesota Description: system reconstruction to reduce flooding Source: Master Plan Group 3 #18 1996 estimate: $400,900 Complete: 1996 Total cost: covered in street project Project# 11-CP4-295 |
| Location: 8th and Tennessee Description: collapsed stone tunnel replaced with concrete pipe Source: inspection / maintenance Complete: 1997 Total cost: $347,511 Project# 68-ST8-1296 |
| Location: North 8th, Ash to Walnut Description: underground pipes to improve roadside drainage Source: inspection / maintenance Complete: 1997 Total cost: work completed by City crew Project# 02-ST1-197 |
| Location: North 2nd, Lyon to Lincoln Description: Insituform liner installed to seal failed pipe joints Source: inspection / maintenance Complete: 1997 Total cost: $77,050 Project# 53-ST7-896 |
| Location: 8th and Monterey Way Description: extended pipes to remove open ditch Source: Engineering Complete: 1998 Total cost: work completed by City crew Project# 35-ST3-696 |
| Location: Dub's Court Description: extended underground pipe to collect system flows Source: inspection / maintenance Complete: 1998 Total cost: work completed by City crew |
| Location: 3rd and Michigan Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #17 1996 estimate: $1,140,300 Complete: 1998 Total cost: $1,435,472 Project# 50-ST5-896 Notes: Top priority in the 1996 Master Plan. An underground pipe and overflow channel were constructed through the backyards of this neighborhood and a double box culvert was built under Arkansas Street. |
picture 1 |
| Location: Carolina, 21st to 23rd Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #9 1996 estimate: $2,563,700 Complete: 1998 Total cost: $2,564,139 Project# 51-ST6-896 Notes: A double RCB (reinforced concrete box) was constructed under the street from 21st and Carolina to the southeast corner of 23rd and Naismith. |
picture 1 |
| Location: Medina Road Description: replaced stream crossing culvert to reduce flood risk Source: Master Plan discretionary Complete: 1998 Total cost: work completed by City crew |
| Location: Deerfield Creek, Creekwood Description: major system extension to remove eroded stream banks Source: Master Plan discretionary Complete: 1999 Total cost: $634,760 Project# 16-ST3-397 Notes: Thirty-six homeowners shared in the cost of this project to remove steep eroded stream banks. |
picture 1 |
| Location: North Crestline at Stowe Description: extended pipes to reduce flood risk Source: Engineering Complete: 1999 Total cost: $45,142 Project# 52-CP11-997 |
| Location: 234 North 8th Description: removal of flooded structure Source: City Commission Complete: 1999 Total cost: $86,000 |
| Location: 29th Court Description: system reconstruction to provide flood control Source: Master Plan Group 1 #6 1996 estimate: $148,000 Complete: 1999 Total cost: $25,090 Project# 57-ST7-1097 Notes: An overflow path was constructed at the end of this street as a more effective alternative to replacement of underground pipes. |
picture 1 |
| Location: 9th, Vermont to New Hampshire Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #26 1996 estimate: $137,000 Complete: 1999 Total cost: $463,416 Project# 56-ST6-1097 Notes: This project combined with sanitary sewer and waterline replacement projects at the center of downtown. The drainage improvement included reconstruction of street intersections. |
picture 1 |
| Location: Quail Creek Watershed Study Description: evaluation of pending development impacts Source: City Commission Complete: 1999 Total cost: work completed by City staff Notes: The City Commission requested this evaluation in response to concerns from citizens. This study focused on the impact of planned development at 6th Street and Monterey Way. |
| Location: 14th Court at Monterey Way Description: system reconstruction to prevent impacts from pending street improvements Source: Engineering Complete: 1999 Total cost: $51,929 Project# 57-ST11-899 |
| Location: Hallmark channel Description: stream channel reconstruction to provide flood control Source: inspection / maintenance Complete: 2000 Total cost: work completed by City crew Notes: Hallmark Cards subsequently dedicated this property to the City for future park use. The City crew graded a grass channel immediately downstream from a newly developed neighborhood to reduce potential flooding. The channel was seeded with native grasses to reduce erosion and provide habitat. |
picture 1 |
| Location: North and North 5th Description: installation of underground pipes to improve roadside drainage Source: inspection / maintenance Complete: 2000 Total cost: work completed by City crew |
| Location: 8th and Pennsylvania Description: system bypass to improve frequent flooding Source: Master Plan discretionary Complete: 2000 Total cost: $61,824 Project# 20-ST2-399 |
| Location: 6th Street, High Pointe Description: system extension to improve pedestrian access Source: Engineering Complete: 2000 Total cost: $36,197 Project# 47-ST9-799 |
| Location: Eldridge and Trail Description: system extension to remove groundwater pavement damage Source: inspection / maintenance Complete: 2000 Total cost: work completed by City crew |
| Location: 7th and Michigan Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #21 1996 estimate: $159,000 Complete: 2000 Total cost: $72,584 transferred to street improvement project Project# 62-CP19-1298 |
| Location: Yorkshire Drive Description: stream channel reconstruction to provide flood control and protect utilities Source: Master Plan discretionary Complete: 2000 Total cost: work completed by City crew |
picture 1 |
| Location: 8th and Connecticut, Phase 1 Description: collapsed stone tunnel replaced with concrete pipe Source: Master Plan Group 3 #25 1996 estimate: $482,000 Complete: 2000 Total cost: $125,418 Project# 14-ST3-200 Notes: This section of the Master Plan project was initiated to address a collapsed stone tunnel under the intersection of 8th and New York Streets. |
picture 1 |
| Location: 8th and Connecticut, Phase 2 Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #25 Complete: 2001 Total cost: $84,154 Project# 83-ST19-1200 Notes: The development project on New Hampshire Street between 9th and 10th Streets completed this improvement to offset increased runoff. |
| Location: Kasold at Meadow Place Description: stream channel reconstruction to increase culvert capacity Source: Master Plan discretionary Complete: 2001 Total cost: work completed by City crew |
| Location: Four Wheel Drive Description: stream channel reconstruction to provide flood control Source: inspection / maintenance Complete: 2001 Total cost: work completed by City crew Project# 40-ST11-600 |
| Location: 1205 Brook Description: removal of flooded structure Source: City Commission Complete: 2001 Total cost: $90,925 |
| Location: Yankee Tank East Hydraulic Study Description: evaluation of stream obstructions near residences Source: City Commission Complete: 2001 Total cost: $15,076 Project# 78-ST18-1100 |
| Location: Illinois at 7th Description: system reconstruction to reduce flooding Source: inspection / maintenance Complete: 2002 Total cost: work completed by City crew |
| Location: Montana Street Description: system reconstruction to replace collapsed pipe Source: inspection / maintenance Complete: 2002 Total cost: $32,965 Project# 57-ST10-901 |
| Location: North Michigan Culvert Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #19 1996 estimate: $102,100 Complete: 2003 Total cost: covered in street project Project# 64-CP20-999 |
picture 1 |
| Location: 21st, Stewart to Naismith Drive Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #10 1996 estimate: $1,256,600 Complete: 2003 Total cost: $1,774,000 Project# 22-ST6-301 Notes: A reinforced concrete box was constructed through this neighborhood on 21st Street from Stewart Avenue to Naismith Drive. The system discharges into Naismith Creek. |
picture 1 |
| Location: Belle Haven, 27th to 29th Terr Description: stream channel reconstruction to facilitate upstream project Source: Engineering Complete: 2003 Total cost: work completed by City crew |
picture 1 |
| Location: 27th to Saratoga Description: system reconstruction to replace collapsed pipe Source: Master Plan Group 3 #14 1996 estimate: $526,000 Complete: 2003 Total cost: $220,182 Project# 62-ST8-1002 Notes: This project was initiated to replace a collapsed pipe and to allow construction of a parallel sanitary sewer by the Department of Utilities. |
| Location: 21st, Kentucky to Barker Court Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #29 1996 estimate: $604,000 Complete: 2004 Total cost: $2,590,000 Project# 21-ST5-301 Notes: A reinforced concrete box was constructed through this neighborhood from 21st and Kentucky to Barker Court. A second phase of the project replaced the box culverts downstream at Learnard Avenue and 19th Street. The drainage improvement required major reconstruction of streets, sanitary sewers and utilities. |
picture 1 |
| Location: 8th and Maine Description: constructed system bypass to abandon collapsed stone tunnel Source: inspection / maintenance Complete: 2004 Total cost: work completed by City crew |
| Location: 27th to Four Wheel Drive Description: stream channel reconstruction to provide flood control Source: inspection / maintenance Complete: 2004 Total cost: work completed by City crew |
| Location: 13th and Oregon Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #28 1996 estimate: $2,248,000 Complete: 2005 Total cost: $3,900,000 Project# 19-ST3-301 Notes: This project removed the system of concrete tunnels built in 1936 and replaced them with a wide vegetated stream from 12th and Haskell to 15th and Maryland. This stream restoration or "stream daylighting" approach provided both flood control and a natural corridor through the neighborhood. 12th Street and 14th Street were permanently closed at the channel. New bridges were constructed at Haskell Avenue, 13th Street and 15th Street. Tributary drainage systems were also reconstructed west of the channel at 13th Street and 15th Street. |
picture 1 |
| Location: Ridge Court Description: removal of flooded structure, overflow grading Source: Master Plan Group 1 #7 1996 estimate: $110,000 Complete: 2005 Total cost: pending Project# 57-ST7-1097 |
| Location: 15th and Lawrence Ave Description: stream bank stabilization to protect utilities Source: Master Plan discretionary Complete: 2005 Total cost: pending Project# 20-ST4-301 |
| Location: Haskell Basin Description: extended detention basin for pollutant removal Source: KDOT grant Complete: 2005 Total cost: pending Project# 77-ST17-1100 Notes: The Kansas Department of Transportation awarded federal transportation funds to the City for this project. A wet detention basin will be constructed southeast of 23rd Street and Haskell Avenue to intercept urban pollutants in the stream draining to Haskell University and the Baker wetlands. |
| Location: North Lawrence Drainage Study Description: to consider drainage problems, development impacts Source: City Commission Complete: 2005 Total cost: $282,333 Project# 39-ST7-703 Notes: The City Commission requested this study to address repeated concerns from residents regarding proposed developments, long-range plans, floodplain regulations and revisions to FEMA maps. The study is scheduled for completion in 2005 and will require several public meetings. |
| Location: 2004 Misc Improvements Description: improvements in four locations to address recent flooding Source: Engineering Complete: 2005 Total cost: pending Project# 57-ST11-1004 Locations: 700 block Maine Street, Arrowhead and Bently Drive, 8th Street and Holiday Drive, 3500 block Trail Road |
| Location: Alabama, 17th to Naismith Drive Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #11 1996 estimate: $2,563,100 Complete: future |
| Location: Maple Lane, 19th to Brook Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #34 1996 estimate: $1,080,000 Complete: future |
| Location: 16th, Kentucky to New Hampshire Description: major system reconstruction to provide flood control Source: Master Plan Group 1 #32 1996 estimate: $2,299,700 Complete: future |
| Location: 23rd & Ousdahl Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #8 1996 estimate: $1,022,800 Complete: future |
picture 1 |
| Location: 8th and Ohio Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #23 1996 estimate: $463,500 Complete: future |
| Location: Stadium to 9th and Mississippi Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #24 1996 estimate: $1,140,000 Complete: future |
| Location: 6th and Arkansas Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #20 1996 estimate: $304,900 Complete: future Project# 07-ST1-299 |
| Location: 19th, Kentucky to Learnard Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #30 1996 estimate: $1,282,900 Complete: future |
| Location: 15th and Iowa West Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #4 1996 estimate: $790,400 Complete: future |
| Location: 23rd and Haskell West Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #16 1996 estimate: $111,000 Complete: future |
| Location: 12th and Kentucky to 8th and Tennessee Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #22 1996 estimate: $946,000 Complete: future |
| Location: North 2nd, Turnpike to North Street Description: major system reconstruction to provide flood control Source: Master Plan Group 2 #40 1996 estimate: $1,494,800 Complete: future |
| Location: 8th / 9th and Holiday Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #2 1996 estimate: $130,000 Complete: future |
| Location: Crestline and Westdale Culverts Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #3 1996 estimate: $139,500 Complete: future |
| Location: 13th and Brook Culvert Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #33 1996 estimate: $171,000 Complete: future |
| Location: 22nd to 23rd Street 1400 West Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #12 1996 estimate: $297,500 Complete: future |
| Location: 26th Street 2300 West Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #13 1996 estimate: $544,250 Complete: future |
| Location: Indian and Massachusetts Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #15 1996 estimate: $325,000 Complete: future |
| Location: Lawrence Avenue, 6th to Harvard Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #5 1996 estimate: $540,000 Complete: future |
| Location: 14th and Massachusetts East Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #27 1996 estimate: $266,400 Complete: future |
| Location: 5th and Lyon to Levee Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #37 1996 estimate: $3,323,000 Complete: future |
| Location: 8th and Maple to Levee Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #38 1996 estimate: $1,648,000 Complete: future |
| Location: 5th and Elm to Levee Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #39 1996 estimate: $226,000 Complete: future |
| Location: 7th and Elm to Levee Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #41 1996 estimate: $285,700 Complete: future |
| Location: 15th, Summit to Prairie Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #35 1996 estimate: $175,100 Complete: future |
| Location: 19th and Haskell North Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #31 1996 estimate: $163,800 Complete: future |
| Location: 15th Street 3500 West Description: major system reconstruction to provide flood control Source: Master Plan Group 3 #1 1996 estimate: $91,200 Complete: future |
| Location: East 19th Street Culvert Description: system reconstruction to provide flood control Source: Master Plan Group 3 #36 1996 estimate: $35,000 Complete: future |
| Location: Sherwood Drive Description: streambank erosion Source: Master Plan discretionary Complete: future |
| Location: Trail and Cattleman Description: replace road crossing to reduce flooding Source: Master Plan discretionary Complete: future |
| Location: 2nd and Iowa Description: reconstruction to reduce roadway flooding Source: Master Plan discretionary Complete: future |
| Location: 4th, Maine to Indiana Description: reconstruction to reduce street flooding Source: Master Plan discretionary Complete: future |
| Location: Harvard and Crestline Description: streambank erosion Centennial to Crestline Source: Master Plan discretionary Complete: future |
| Location: Avalon and Cambridge Description: streambank erosion Source: Master Plan discretionary Complete: future |
| Location: 11th and Rhode Island Description: reconstruction to reduce street flooding Source: Master Plan discretionary Complete: future |
| Location: 11th and Ohio Description: reconstruction to reduce street flooding Source: Master Plan discretionary Complete: future |
| Location: 17th and Barker Description: extension to reduce flooding Source: Master Plan discretionary Complete: future |
| Location: 21st and Maple Description: reconstruction to reduce flooding Source: Master Plan discretionary Complete: future |
| Location: Crestline Court Description: reconstruction to reduce flooding Source: Master Plan discretionary Complete: future |
| Location: Dakota, Nebraska Description: reconstruction to reduce flooding Source: Master Plan discretionary Complete: future |
| Location: Ponderosa at Trail Dust Description: reconstruction to reduce flooding Source: Master Plan discretionary Complete: future |
| Location: Arrowhead and Peterson Description: reconstruction to reduce flooding Source: Engineering Complete: future |
| Location: Stetson and Tumbleweed Description: reconstruction to reduce flooding Source: Engineering Complete: future |
| Location: Freedom Hill Court Description: extension to reduce flooding Source: Engineering Complete: future |
| Location: University and Stratford Description: reconstruction to reduce flooding Source: Engineering Complete: future |