Stormwater project list

Construction Projects

Publicly funded stormwater projects completed since 1996 and planned for the future...

Quick List (click on the location for more information)

Complete Location Total Cost Source
1996 4th and Minnesota street project Master Plan Group 3 #18
1997 8th and Tennessee $347,511 inspection / maintenance
1997 North 8th, Ash to Walnut City crew inspection / maintenance
1997 North 2nd, Lyon to Lincoln $77,050 inspection / maintenance
1998 8th and Monterey Way City crew Engineering
1998 Dub's Court City crew inspection / maintenance
1998 3rd and Michigan $1,435,472 Master Plan Group 1 #17
1998 Carolina, 21st to 23rd $2,564,139 Master Plan Group 1 #9
1998 Medina Road City crew Master Plan discretionary
1999 Deerfield Creek, Creekwood $634,760 Master Plan discretionary
1999 North Crestline at Stowe $45,142 Engineering
1999 234 North 8th $86,000 City Commission
1999 29th Court $25,090 Master Plan Group 1 #6
1999 9th, Vermont to New Hampshire $463,416 Master Plan Group 1 #26
1999 Quail Creek Watershed Study City staff City Commission
1999 14th Court at Monterey Way $51,929 Engineering
2000 Hallmark channel City crew inspection / maintenance
2000 North and North 5th City crew inspection / maintenance
2000 8th and Pennsylvania $61,824 Master Plan discretionary
2000 6th Street, High Pointe $36,197 Engineering
2000 Eldridge and Trail City crew inspection / maintenance
2000 7th and Michigan $72,584 Master Plan Group 3 #21
2000 Yorkshire Drive City crew Master Plan discretionary
2000 8th and Connecticut, Phase 1 $125,418 Master Plan Group 3 #25
2001 8th and Connecticut, Phase 2 $84,154 Master Plan Group 3 #25
2001 Kasold at Meadow Place City crew Master Plan discretionary
2001 Four Wheel Drive City crew inspection / maintenance
2001 1205 Brook $90,925 City Commission
2001 Yankee Tank East Hydraulic Study $15,076 City Commission
2002 Illinois at 7th City crew inspection / maintenance
2002 Montana Street $32,965 inspection / maintenance
2003 North Michigan Culvert street project Master Plan Group 3 #19
2003 21st, Stewart to Naismith Drive $1,774,000 Master Plan Group 1 #10
2003 Belle Haven, 27th to 29th Terr City crew Engineering
2003 27th to Saratoga $220,182 Master Plan Group 3 #14
2004 21st, Kentucky to Barker Court $2,590,000 Master Plan Group 1 #29
2004 8th and Maine City crew inspection / maintenance
2004 27th to Four Wheel Drive City crew inspection / maintenance
2005 13th and Oregon $3,900,000 Master Plan Group 1 #28
2005 Ridge Court City crew Master Plan Group 1 #7
2005 15th and Lawrence Ave pending Master Plan discretionary
2005 Haskell Basin pending KDOT grant
2005 North Lawrence Drainage Study $282,333 City Commission
2005 2004 Misc Improvements pending Engineering
future Alabama, 17th to Naismith Drive - Master Plan Group 1 #11
future Maple Lane, 19th to Brook - Master Plan Group 1 #34
future 16th, Kentucky to New Hampshire - Master Plan Group 1 #32
future 23rd & Ousdahl - Master Plan Group 2 #8
future 8th and Ohio - Master Plan Group 2 #23
future Stadium to 9th and Mississippi - Master Plan Group 2 #24
future 6th and Arkansas - Master Plan Group 2 #20
future 19th, Kentucky to Learnard - Master Plan Group 2 #30
future 15th and Iowa West - Master Plan Group 2 #4
future 23rd and Haskell West - Master Plan Group 2 #16
future 12th and Kentucky to 8th and Tennessee - Master Plan Group 2 #22
future North 2nd, Turnpike to North Street - Master Plan Group 2 #40
future 8th / 9th and Holiday - Master Plan Group 3 #2
future Crestline and Westdale Culverts - Master Plan Group 3 #3
future 13th and Brook Culvert - Master Plan Group 3 #33
future 22nd to 23rd Street 1400 West - Master Plan Group 3 #12
future 26th Street 2300 West - Master Plan Group 3 #13
future Indian and Massachusetts - Master Plan Group 3 #15
future Lawrence Avenue, 6th to Harvard - Master Plan Group 3 #5
future 14th and Massachusetts East - Master Plan Group 3 #27
future 5th and Lyon to Levee - Master Plan Group 3 #37
future 8th and Maple to Levee - Master Plan Group 3 #38
future 5th and Elm to Levee - Master Plan Group 3 #39
future 7th and Elm to Levee - Master Plan Group 3 #41
future 15th, Summit to Prairie - Master Plan Group 3 #35
future 19th and Haskell North - Master Plan Group 3 #31
future 15th Street 3500 West - Master Plan Group 3 #1
future East 19th Street Culvert - Master Plan Group 3 #36
future Sherwood Drive - Master Plan discretionary
future Trail and Cattleman - Master Plan discretionary
future 2nd and Iowa - Master Plan discretionary
future 4th, Maine to Indiana - Master Plan discretionary
future Harvard and Crestline - Master Plan discretionary
future Avalon and Cambridge - Master Plan discretionary
future 11th and Rhode Island - Master Plan discretionary
future 11th and Ohio - Master Plan discretionary
future 17th and Barker - Master Plan discretionary
future 21st and Maple - Master Plan discretionary
future Crestline Court - Master Plan discretionary
future Dakota, Nebraska - Master Plan discretionary
future Ponderosa at Trail Dust - Master Plan discretionary
future Arrowhead and Peterson - Engineering
future Stetson and Tumbleweed - Engineering
future Freedom Hill Court - Engineering
future University and Stratford - Engineering

Expanded List


Location: 4th and Minnesota
Description: system reconstruction to reduce flooding
Source: Master Plan Group 3 #18
1996 estimate: $400,900
Complete: 1996
Total cost: covered in street project
Project# 11-CP4-295

Location: 8th and Tennessee
Description: collapsed stone tunnel replaced with concrete pipe
Source: inspection / maintenance
Complete: 1997
Total cost: $347,511
Project# 68-ST8-1296

Location: North 8th, Ash to Walnut
Description: underground pipes to improve roadside drainage
Source: inspection / maintenance
Complete: 1997
Total cost: work completed by City crew
Project# 02-ST1-197

Location: North 2nd, Lyon to Lincoln
Description: Insituform liner installed to seal failed pipe joints
Source: inspection / maintenance
Complete: 1997
Total cost: $77,050
Project# 53-ST7-896

Location: 8th and Monterey Way
Description: extended pipes to remove open ditch
Source: Engineering
Complete: 1998
Total cost: work completed by City crew
Project# 35-ST3-696

Location: Dub's Court
Description: extended underground pipe to collect system flows
Source: inspection / maintenance
Complete: 1998
Total cost: work completed by City crew


Location: 3rd and Michigan
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #17
1996 estimate: $1,140,300
Complete: 1998
Total cost: $1,435,472
Project# 50-ST5-896
Notes: Top priority in the 1996 Master Plan. An underground pipe and overflow channel were constructed through the backyards of this neighborhood and a double box culvert was built under Arkansas Street.
picture 1

picture 2



Location: Carolina, 21st to 23rd
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #9
1996 estimate: $2,563,700
Complete: 1998
Total cost: $2,564,139
Project# 51-ST6-896

Notes: A double RCB (reinforced concrete box) was constructed under the street from 21st and Carolina to the southeast corner of 23rd and Naismith.

picture 1

picture 2


Location: Medina Road
Description: replaced stream crossing culvert to reduce flood risk
Source: Master Plan discretionary
Complete: 1998
Total cost: work completed by City crew


Location: Deerfield Creek, Creekwood
Description: major system extension to remove eroded stream banks
Source: Master Plan discretionary
Complete: 1999
Total cost: $634,760
Project# 16-ST3-397
Notes: Thirty-six homeowners shared in the cost of this project to remove steep eroded stream banks.
picture 1

picture 2

picture 3


Location: North Crestline at Stowe
Description: extended pipes to reduce flood risk
Source: Engineering
Complete: 1999
Total cost: $45,142
Project# 52-CP11-997

Location: 234 North 8th
Description: removal of flooded structure
Source: City Commission
Complete: 1999
Total cost: $86,000


Location: 29th Court
Description: system reconstruction to provide flood control
Source: Master Plan Group 1 #6
1996 estimate: $148,000
Complete: 1999
Total cost: $25,090
Project# 57-ST7-1097
Notes: An overflow path was constructed at the end of this street as a more effective alternative to replacement of underground pipes.
picture 1

picture 2



Location: 9th, Vermont to New Hampshire
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #26
1996 estimate: $137,000
Complete: 1999
Total cost: $463,416
Project# 56-ST6-1097
Notes: This project combined with sanitary sewer and waterline replacement projects at the center of downtown. The drainage improvement included reconstruction of street intersections.
picture 1

picture 2

picture 3


Location: Quail Creek Watershed Study
Description: evaluation of pending development impacts
Source: City Commission
Complete: 1999
Total cost: work completed by City staff
Notes: The City Commission requested this evaluation in response to concerns from citizens. This study focused on the impact of planned development at 6th Street and Monterey Way.

Location: 14th Court at Monterey Way
Description: system reconstruction to prevent impacts from pending street improvements
Source: Engineering
Complete: 1999
Total cost: $51,929
Project# 57-ST11-899


Location: Hallmark channel
Description: stream channel reconstruction to provide flood control
Source: inspection / maintenance
Complete: 2000
Total cost: work completed by City crew
Notes: Hallmark Cards subsequently dedicated this property to the City for future park use. The City crew graded a grass channel immediately downstream from a newly developed neighborhood to reduce potential flooding. The channel was seeded with native grasses to reduce erosion and provide habitat.
picture 1

picture 2

picture 3


Location: North and North 5th
Description: installation of underground pipes to improve roadside drainage
Source: inspection / maintenance
Complete: 2000
Total cost: work completed by City crew

Location: 8th and Pennsylvania
Description: system bypass to improve frequent flooding
Source: Master Plan discretionary
Complete: 2000
Total cost: $61,824
Project# 20-ST2-399

Location: 6th Street, High Pointe
Description: system extension to improve pedestrian access
Source: Engineering
Complete: 2000
Total cost: $36,197
Project# 47-ST9-799

Location: Eldridge and Trail
Description: system extension to remove groundwater pavement damage
Source: inspection / maintenance
Complete: 2000
Total cost: work completed by City crew

Location: 7th and Michigan
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #21
1996 estimate: $159,000
Complete: 2000
Total cost: $72,584 transferred to street improvement project
Project# 62-CP19-1298


Location: Yorkshire Drive
Description: stream channel reconstruction to provide flood control and protect utilities
Source: Master Plan discretionary
Complete: 2000
Total cost: work completed by City crew
picture 1

picture 2

picture 3



Location: 8th and Connecticut, Phase 1
Description: collapsed stone tunnel replaced with concrete pipe
Source: Master Plan Group 3 #25
1996 estimate: $482,000
Complete: 2000
Total cost: $125,418
Project# 14-ST3-200
Notes: This section of the Master Plan project was initiated to address a collapsed stone tunnel under the intersection of 8th and New York Streets.
picture 1

picture 2

picture 3


Location: 8th and Connecticut, Phase 2
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #25
Complete: 2001
Total cost: $84,154
Project# 83-ST19-1200
Notes: The development project on New Hampshire Street between 9th and 10th Streets completed this improvement to offset increased runoff.

Location: Kasold at Meadow Place
Description: stream channel reconstruction to increase culvert capacity
Source: Master Plan discretionary
Complete: 2001
Total cost: work completed by City crew

Location: Four Wheel Drive
Description: stream channel reconstruction to provide flood control
Source: inspection / maintenance
Complete: 2001
Total cost: work completed by City crew
Project# 40-ST11-600

Location: 1205 Brook
Description: removal of flooded structure
Source: City Commission
Complete: 2001
Total cost: $90,925

Location: Yankee Tank East Hydraulic Study
Description: evaluation of stream obstructions near residences
Source: City Commission
Complete: 2001
Total cost: $15,076
Project# 78-ST18-1100

Location: Illinois at 7th
Description: system reconstruction to reduce flooding
Source: inspection / maintenance
Complete: 2002
Total cost: work completed by City crew

Location: Montana Street
Description: system reconstruction to replace collapsed pipe
Source: inspection / maintenance
Complete: 2002
Total cost: $32,965
Project# 57-ST10-901


Location: North Michigan Culvert
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #19
1996 estimate: $102,100
Complete: 2003
Total cost: covered in street project
Project# 64-CP20-999
picture 1



Location: 21st, Stewart to Naismith Drive
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #10
1996 estimate: $1,256,600
Complete: 2003
Total cost: $1,774,000
Project# 22-ST6-301
Notes: A reinforced concrete box was constructed through this neighborhood on 21st Street from Stewart Avenue to Naismith Drive. The system discharges into Naismith Creek.
picture 1

picture 2

picture 3


Location: Belle Haven, 27th to 29th Terr
Description: stream channel reconstruction to facilitate upstream project
Source: Engineering
Complete: 2003
Total cost: work completed by City crew
picture 1

picture 2

picture 3


Location: 27th to Saratoga
Description: system reconstruction to replace collapsed pipe
Source: Master Plan Group 3 #14
1996 estimate: $526,000
Complete: 2003
Total cost: $220,182
Project# 62-ST8-1002

Notes: This project was initiated to replace a collapsed pipe and to allow construction of a parallel sanitary sewer by the Department of Utilities.


Location: 21st, Kentucky to Barker Court
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #29
1996 estimate: $604,000
Complete: 2004
Total cost: $2,590,000
Project# 21-ST5-301
Notes: A reinforced concrete box was constructed through this neighborhood from 21st and Kentucky to Barker Court. A second phase of the project replaced the box culverts downstream at Learnard Avenue and 19th Street. The drainage improvement required major reconstruction of streets, sanitary sewers and utilities.
picture 1

picture 2

picture 3


Location: 8th and Maine
Description: constructed system bypass to abandon collapsed stone tunnel
Source: inspection / maintenance
Complete: 2004
Total cost: work completed by City crew

Location: 27th to Four Wheel Drive
Description: stream channel reconstruction to provide flood control
Source: inspection / maintenance
Complete: 2004
Total cost: work completed by City crew


Location: 13th and Oregon
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #28
1996 estimate: $2,248,000
Complete: 2005
Total cost: $3,900,000
Project# 19-ST3-301
Notes: This project removed the system of concrete tunnels built in 1936 and replaced them with a wide vegetated stream from 12th and Haskell to 15th and Maryland. This stream restoration or "stream daylighting" approach provided both flood control and a natural corridor through the neighborhood. 12th Street and 14th Street were permanently closed at the channel. New bridges were constructed at Haskell Avenue, 13th Street and 15th Street. Tributary drainage systems were also reconstructed west of the channel at 13th Street and 15th Street.
picture 1

picture 2

picture 3


Location: Ridge Court
Description: removal of flooded structure, overflow grading
Source: Master Plan Group 1 #7
1996 estimate: $110,000
Complete: 2005
Total cost: pending
Project# 57-ST7-1097

Location: 15th and Lawrence Ave
Description: stream bank stabilization to protect utilities
Source: Master Plan discretionary
Complete: 2005
Total cost: pending
Project# 20-ST4-301

Location: Haskell Basin
Description: extended detention basin for pollutant removal
Source: KDOT grant
Complete: 2005
Total cost: pending
Project# 77-ST17-1100
Notes: The Kansas Department of Transportation awarded federal transportation funds to the City for this project. A wet detention basin will be constructed southeast of 23rd Street and Haskell Avenue to intercept urban pollutants in the stream draining to Haskell University and the Baker wetlands.

Location: North Lawrence Drainage Study
Description: to consider drainage problems, development impacts
Source: City Commission
Complete: 2005
Total cost: $282,333
Project# 39-ST7-703
Notes: The City Commission requested this study to address repeated concerns from residents regarding proposed developments, long-range plans, floodplain regulations and revisions to FEMA maps. The study is scheduled for completion in 2005 and will require several public meetings.

Location: 2004 Misc Improvements
Description: improvements in four locations to address recent flooding
Source: Engineering
Complete: 2005
Total cost: pending
Project# 57-ST11-1004
Locations: 700 block Maine Street, Arrowhead and Bently Drive, 8th Street and Holiday Drive, 3500 block Trail Road

Location: Alabama, 17th to Naismith Drive
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #11
1996 estimate: $2,563,100
Complete: future

Location: Maple Lane, 19th to Brook
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #34
1996 estimate: $1,080,000
Complete: future

Location: 16th, Kentucky to New Hampshire
Description: major system reconstruction to provide flood control
Source: Master Plan Group 1 #32
1996 estimate: $2,299,700
Complete: future

Location: 23rd & Ousdahl
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #8
1996 estimate: $1,022,800
Complete: future
picture 1


Location: 8th and Ohio
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #23
1996 estimate: $463,500
Complete: future

Location: Stadium to 9th and Mississippi
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #24
1996 estimate: $1,140,000
Complete: future

Location: 6th and Arkansas
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #20
1996 estimate: $304,900
Complete: future
Project# 07-ST1-299

Location: 19th, Kentucky to Learnard
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #30
1996 estimate: $1,282,900
Complete: future

Location: 15th and Iowa West
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #4
1996 estimate: $790,400
Complete: future

Location: 23rd and Haskell West
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #16
1996 estimate: $111,000
Complete: future

Location: 12th and Kentucky to 8th and Tennessee
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #22
1996 estimate: $946,000
Complete: future

Location: North 2nd, Turnpike to North Street
Description: major system reconstruction to provide flood control
Source: Master Plan Group 2 #40
1996 estimate: $1,494,800
Complete: future

Location: 8th / 9th and Holiday
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #2
1996 estimate: $130,000
Complete: future

Location: Crestline and Westdale Culverts
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #3
1996 estimate: $139,500
Complete: future

Location: 13th and Brook Culvert
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #33
1996 estimate: $171,000
Complete: future

Location: 22nd to 23rd Street 1400 West
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #12
1996 estimate: $297,500
Complete: future

Location: 26th Street 2300 West
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #13
1996 estimate: $544,250
Complete: future

Location: Indian and Massachusetts
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #15
1996 estimate: $325,000
Complete: future

Location: Lawrence Avenue, 6th to Harvard
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #5
1996 estimate: $540,000
Complete: future

Location: 14th and Massachusetts East
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #27
1996 estimate: $266,400
Complete: future

Location: 5th and Lyon to Levee
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #37
1996 estimate: $3,323,000
Complete: future

Location: 8th and Maple to Levee
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #38
1996 estimate: $1,648,000
Complete: future

Location: 5th and Elm to Levee
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #39
1996 estimate: $226,000
Complete: future

Location: 7th and Elm to Levee
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #41
1996 estimate: $285,700
Complete: future

Location: 15th, Summit to Prairie
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #35
1996 estimate: $175,100
Complete: future

Location: 19th and Haskell North
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #31
1996 estimate: $163,800
Complete: future

Location: 15th Street 3500 West
Description: major system reconstruction to provide flood control
Source: Master Plan Group 3 #1
1996 estimate: $91,200
Complete: future

Location: East 19th Street Culvert
Description: system reconstruction to provide flood control
Source: Master Plan Group 3 #36
1996 estimate: $35,000
Complete: future

Location: Sherwood Drive
Description: streambank erosion
Source: Master Plan discretionary
Complete: future

Location: Trail and Cattleman
Description: replace road crossing to reduce flooding
Source: Master Plan discretionary
Complete: future

Location: 2nd and Iowa
Description: reconstruction to reduce roadway flooding
Source: Master Plan discretionary
Complete: future

Location: 4th, Maine to Indiana
Description: reconstruction to reduce street flooding
Source: Master Plan discretionary
Complete: future

Location: Harvard and Crestline
Description: streambank erosion Centennial to Crestline
Source: Master Plan discretionary
Complete: future

Location: Avalon and Cambridge
Description: streambank erosion
Source: Master Plan discretionary
Complete: future

Location: 11th and Rhode Island
Description: reconstruction to reduce street flooding
Source: Master Plan discretionary
Complete: future

Location: 11th and Ohio
Description: reconstruction to reduce street flooding
Source: Master Plan discretionary
Complete: future

Location: 17th and Barker
Description: extension to reduce flooding
Source: Master Plan discretionary
Complete: future

Location: 21st and Maple
Description: reconstruction to reduce flooding
Source: Master Plan discretionary
Complete: future

Location: Crestline Court
Description: reconstruction to reduce flooding
Source: Master Plan discretionary
Complete: future

Location: Dakota, Nebraska
Description: reconstruction to reduce flooding
Source: Master Plan discretionary
Complete: future

Location: Ponderosa at Trail Dust
Description: reconstruction to reduce flooding
Source: Master Plan discretionary
Complete: future

Location: Arrowhead and Peterson
Description: reconstruction to reduce flooding
Source: Engineering
Complete: future

Location: Stetson and Tumbleweed
Description: reconstruction to reduce flooding
Source: Engineering
Complete: future

Location: Freedom Hill Court
Description: extension to reduce flooding
Source: Engineering
Complete: future

Location: University and Stratford
Description: reconstruction to reduce flooding
Source: Engineering
Complete: future