Memorandum

City of Lawrence

Public Works

 

TO:

David P. Cronin, P.E., City Engineer

FROM:

Zachary D. Baker, P.E., Project Engineer

CC:

Charles F. Soules, P.E., Director of Public Works

Mark Thiel, Assistant Director of Public Works

DATE:

June 9, 2015

RE:

Project PW1501 KLINK Project, Iowa Street (U.S. 59 HWY) From North of 23rd Street to 19th Street; & From North of 19th Street to South of 15th Street, & From South of Harvard Road to South of 6th Street, KDOT project U-0318-01 - Set Bid Date Sign City/State Agreement

 

Background

On June 2, 2015 the City of Lawrence opened proposals for the following:

 

City Bid No. 1528

Project PW1501 – KLINK, Iowa Street (U.S. 59 HWY) from North of 23rd Street to 19th Street; and from North of 19th Street to South of 15th Street, and from South of Harvard Road to South of 6th Street.

 

VENDOR

TOTAL BID

Engineer’s Estimate

$788,094.15

Bettis Asphalt & Construction

$796,227.35

Little Joe’s Asphalt Paving

$858,190.23

Sunflower Paving Inc.

$958,352.60

 

Project Description

The 2015 KLINK project includes the milling and overlay of pavement on Iowa Street between 23rd Street and the Irving Hill Road bridge and Harvard Road to south of 6th Street (see attached map). Repairing these sections of road will provide a new surface on Iowa Street from 23rd Street to 6th Street which will tie together the three recent 2013/2014 intersection reconstruction projects at 6th, 15th, and 23rd and Iowa.  New pavement markings will be included and video detection camera systems will be installed on traffic signals at the 19th & Iowa, Harvard & Iowa, and 9th & Iowa intersections. The project will cause minor traffic interruptions and lane closures during the mill and overlay operations, but will maintain at least one through lane in each direction at all times.

 

Portions of this project will be occurring during the same time as KU makes improvements to the Irving Hill Bridge. The City and KU will work together and coordinate the work to minimize traffic disruptions and maintain at least one lane of traffic in each direction open at all times.

 

Project Funding

The project bid at $796,227.35. The city had budgeted for the project to cost $800,000 with $200,000 being funded by KDOT.

 

Project Schedule

Award Contract: June 9, 2015

Anticipated Start Date: June 2015

Project Completion Date: August 2015

 

Action Request

Contingent on KDOT approval of bid, authorize the Mayor to approve bid from Bettis Asphalt & Construction for Project PW1501, KLINK, Iowa Street (U.S. 59 HWY) from North of 23rd Street to 19th Street; and from North of 19th Street to South of 15th Street, and from South of Harvard Road to South of 6th Street, in the amount of $796,227.35 provided the contractor can meet the terms established in the contract documents.