Utilities Department - 2015 List of Changes to Standard Specifications
Construction and Material Specifications Section 2500 – Sanitary Sewer (8” to 18” Mains)
- Added Section 2503.2.2.e - Material Specification for Stainless Steel Bolts
- Revised Section 2503.2.3.b – Modify allowable application for use of Fusible PVC
- Revised Section 2506.2.10.a – Location Wire to meet manufactures recommendations for uses
- Revised Section 2506.2.10.e – Added Copperhead SnakeBite only used with Copperhead Wire
- Revised Section 2507.2.8 – No rock allowed within 36 inches of pipe embedment and no rock greater than 3” in any trench.
- Added Section 2510.3.8.a.3 – Specific manhole rig and lid specifications
- Revised Section 2511.1 – Revised to match water separation requirements
- Added Section 2511.2 - Added separation requirements between utilities other than water lines.
- Revised Section 2512.5 – Added Mobilization, Testing, Demobilization to Standard Bid Items
Construction and Material Specifications Section 2900 - Waterlines
- Revised Section 2902.2.1 – Included Anchor Couplings in Description
- Revised Section 2902.2.2 – Revised marking specifications for pipe
- Revised Section 2902.2.3 – Modify allowable application for use of Fusible PVC
- Added Section 2902.5 – Stainless Steel Bolt Specification
- Revised Section 2902.6.7 – Added acceptable meter setter
- Revised Section 2902.8.1.a – Location wire to meet manufactures recommendations for uses
- Revised Section 2902.8.1.c – Added meter tiles to accessible location for tracer wire.
- Revised Section 2902.8.1.d – Added Copperhead SnakeBite only used with Copperhead Wire
- Revised Section 2902.8.1.c – Added tracer wire accessibility at meter tiles
- Revised Section 2902.8.1.e – Added Anodes on service line tracer wire if not connected to main wire
- Added Section 2902.11.9 – Minimum casing pipe diameters
- Revised Section 2903.8.a – No rock within 36 inches of waterline
- Revised Section 2903.8.d – No rock within 36 inches of waterline
- Added Section 2903.9.3.4 – Gauges shall have documentation of calibration
- Added Section 2903.12 – Separation requirements between utilities other than sanitary sewer
- Revised Section 2904.5 – Added Mobilization, Disinfection and Pressure Testing, Demobilization to standard bid items.
Design Criteria Section 5500 – Sanitary Sewer (8” to 18” Mains)
- Revised Section 5504.5 – Revised to match water separation requirements
- Added Section 5504.6 – Separation requirements between utilities other than water lines
Design Criteria Section 5900 - Waterlines
- Revised Section 2905.2.1 – specified “back of curb” waterlines minimum cover of 42”
- Added Section 2905.2.2 – minimum cover for waterlines under pavement of 60”
- Added Section 5905.4 – separation requirements between utilities other than sanitary sewer
- Revised Section 5907.2 – revised backflow prevention location requirements based on size of fire line.
Standard Details - Water
Sheet 1: Added tracer wire to service connection details
Added meter support to “Typical ¾” & 1” Service Connections
Revised note 3 to match tracer wire specifications
Revised note 1 to specify the need for an anode on service connections if wire cannot be connected to main wire.
Sheet 2: Revised minimum depth on the “Waterline ROW Crossing Details” under pavement to be 60”
Revised wording on “Fire Hydrant Detail” to be called “Fire Hydrant Assembly Detail”
Standard Details - Sanitary Sewer
Sheet 1: Revised note 7 to match the specifications.
Sheet2: Added General Note to casing pipe detail clarifying the need to install anode.
Standard Details - Meter Vault
- Revised Note 7 to state “NRS Resilient seat gate valve with handwheel, FLxFL
Fireline Connections – Typical Connection Details
- Removed “Short Service Backflow Located Outside of Building” from details.