Memorandum
City of Lawrence
Public Works
TO: |
David P. Cronin, P.E., City Engineer |
CC: |
Charles Soules, P.E., Director of Public Works |
FROM: |
Matt Bond, P.E., Stormwater Engineer/Farmland Project Manager |
DATE: |
October 31, 2014 |
RE: |
Agenda Item - Project PW1323 - City Bid No. B1462 Interceptor Trench at Lawrence Venture Park |
Please include the following item on the City Commission Agenda for consideration at the November 11, 2014 meeting.
Project Description & Background
With the acquisition of the former Farmland Industries Nitrogen Plant, now known as Lawrence VenturePark, the City is bound by consent order (Case No. 10-E-94 BER) to follow the environmental remediation procedures outlined in the Corrective Action Decision (CAD) authored by the Kansas Department of Health & Environment (KDHE) signed March 3, 2010. The CAD requires the remediation of nitrogen impacted ground water seeping from the sandstone hill in the north central part of the site known as the Central Ponds. When the site was still operating as Farmland Industries, this location included open air settlement ponds. Some of the contents of these ponds leached into the sandstone hill and are now surfacing from its southern side slope. The CAD stipulates the construction of an interceptor trench(s) to remediate this surfacing nitrogen impacted ground water. (see attached map)
Project Funding
The project is funded entirely with the environmental remediation fund obtained with the acquisition of the site and has been approved by the Kansas Department of Health & Environment.
Project Schedule
Advertise for bids: November 12, 2014 |
Anticipated Start Date: Mid December 2014 |
Bid date: November 25, 2014 |
Project Completion Date: Spring 2015 |
Action
Set bid date of November 25, 2014 for the construction of interceptor trenches north of the Central Ponds area at Lawrence Venture Park- Project No. PW1323.