Memorandum

City of Lawrence

Utilities Department

 

TO:

David L. Corliss – City Manager

Cynthia Wagner - Assistant City Manager

Diane Stoddard - Assistant City Manager

FROM:

Melinda Harger – Utilities Engineer

CC:

Dave Wagner – Director of Utilities

Mike Lawless – Deputy Director of Utilities

Philip Ciesielski – Assistant Director of Utilities

Toni Wheeler – City Attorney

R. Scott Wagner – Management Analyst

Beth Krishtalka – Assistant to Director

Mark Hegeman – Utilities Operations Superintendent

Dave King – Utilities Maintenance Superintendent

Bob Brower – Utilities Field Services Superintendent

Leah Morris – Project Engineer

Date:

June 25, 2014

RE:

July 1, 2014 Agenda Item – Award Bid for Bid Number B1435, UT1304 Contract 3 Wakarusa WWTP Site Fill and E1600/N1175 Road Improvements

 

Background/Project Description

The 2012 Wastewater Utilities Master Plan and Capital Improvements Program recommend the construction of the Wakarusa Wastewater Treatment Plant (WWTP) and Conveyance Corridor facilities to be online in 2018.  These improvements are required to mitigate wet weather surcharging of sanitary sewers along the 31st Street Corridor, provide for relief of wet weather overloading at the existing WWTP, and provide additional organic treatment capacity to provide for future growth of the community.

 

The Conveyance Corridor improvements include a pump station facility in the area of 31st and Louisiana and required force mains and gravity sewers to convey sewerage to and from this point to the Wakarusa WWTP.

 

Project Status

March 12, 2013 – City Commission authorized staff to advertise a Request for Proposals for Engineering Services for the Wakarusa Wastewater Treatment Plant and Conveyance Corridor Facilities. 

 

July 23, 2013 – City Commission authorized execution of the engineering services agreement with Black & Veatch Corporation for initial design services.

 

October 22, 2013 – City Commission authorized execution of Supplement No. 1 with Black & Veatch for preliminary design of the Wakarusa WWTP and Pump Station No. 10 as well as final design of the force mains, roads adjacent to the WWTP, and WWTP site fill.

 

March 11, 2014 – City Commission accepted dedication and vacation of easements and rights-of-way associated with the final plat for the Wakarusa Wastewater Treatment Plant Addition.

 

March 24, 2014 – City Manager executed Supplement No. 2 with Black & Veatch for a facility space needs analysis.

 

April 8, 2014 – City Commission awarded UT1304 Contract 1 Wakarusa Conveyance, Haskell Avenue Casing Pipe to Emery Sapp & Sons, Inc. in the amount of $88,600.

 

April 8, 2014 – City Commission authorized execution of Supplement No. 3 with Black & Veatch for additional preliminary design tasks and detailed design of the Baker Wetlands enhancements.

 

April 22, 2014 – City Commission authorized execution of Supplement No. 4 with Black & Veatch for detailed final design and bidding of the Wakarusa WWTP, Pump Station No. 10, and Kansas River WWTP Lab Improvements as well as construction phase services for the force mains, roads adjacent to the Wakarusa WWTP, and Wakarusa WWTP site fill.

 

Project Details

Project UT1304 consists of multiple design and construction contracts.  UT1304 Contract 3 (PW1405) includes road improvements for E1600 Rd (O’Connell Rd) and N1175 Rd (41st Street) to provide access to the Wakarusa WWTP.  E1600 Rd will be the primary access to the site from N1100 Rd.  It will be improved to an Alternative City Street Construction Standard designed to accommodate the anticipated truck traffic during construction and operation of the WWTP.  The alternative street standard allows for the use of an open ditch vs. a curb and gutter road section.  Construction of the pavement section on E1600 will be phased such that a base section is built to handle construction traffic and a final asphalt or concrete surface will be added to E1600 Rd upon completion of the WWTP construction.  N1175 Rd will be the secondary access to the site and will be improved to a gravel road with a chip & seal surface.  Improvements include relocations of the RWD4 and Baldwin waterlines along E1600 Rd south of the metering station.  Contract 3 also includes placement of fill at the Wakarusa WWTP site to allow for consolidation to take place prior to facility construction beginning in 2015.

 

Bid Details

On June 24, 2014 bids were received from the following six (6) bidders.  The bids were opened and the bids listed below publicly read aloud.

 

 

King’s Construction

$5,086,413.65

Sporer Land Development

$5,359,519.10

Amino Brothers Company

$6,261,764.76

Emery Sapp & Sons

$6,812,419.45

RD Johnson

$6,887,455.50

HAMM

$7,505,819.10

 

 

Engineer’s Estimate

$6,796,690.00

 

Based on a review of the bids and the qualifications of the low bidder, Department of Utilities staff recommends awarding the bid to the low bidder, King’s Construction.

 

Project Schedule

Award Bid     

July 1, 2014

Anticipated Notice to Proceed         

July 15, 2014

Project Completion  

December 19, 2014

 

Attached is an updated list of anticipated milestones for the UT1304 project.  Tentative dates for City Commission agenda items are shown for the numerous design and construction contracts associated with this project.

 

Right of Way and Easement Acquisition

See the attached map for the location of the WWTP site and right-of-way and easement acquisition for the plant.  Additional road right-of-way for E 1600 Road (O’Connell Road inside the City limits) and N 1175 is required as part of the planned plant site improvements.  Additional waterline and utility easements are also being acquired along E 1600 Rd to the south of the plant site.

 

In March of this year an appraisal was conducted by Aul Appraisals of the various property interests needed on each tract.  Offers to purchase the land interests have been sent to all the property owners.  On Tract 2, a revised offer of compensation based on the Douglas County Appraiser’s office land valuation was provided.  On this tract, a total of 3,120 sq. feet of additional right-of-way is needed.  Additionally 6,240 square feet of utility, waterline and drainage easements are also required.  The City also had prepared a separate appraisal for the loss of trees and landscaping on the tract. The property owner has accepted the appraised offer of the City in the amount of $21,707.60 for the required property interests. 

                                                                          

Project Funding

The project is included in the Department of Utilities Rate Plan and Capital Improvement Program.

 

Action

Award Bid for Bid Number B1435, UT1304 Contract 3 Wakarusa WWTP Site Fill and E1600/N1175 Road Improvements to the low bidder King’s Construction in the amount of $5,086,413.65 and authorize the City Manager to execute the contract.

 

Authorize payment to Clay & April Phillips in the amount of $21,707.60 for acquisition of easements and right-of-way for E 1600 Rd.