City of Lawrence

Planning & Development Services

 

MEMORANDUM

 

DATE: August 29, 2012      

 

TO:     David L. Corliss, City Manager       

 

FROM: Jessica Roberts, Projects Specialist 

 

 

On August 28, 2012 the City of Lawrence opened proposals for the following:   

 

Bid #B1247 – 3012 Flint Drive – Community Development Division

 

    

   B1247

 

Base Bid

Alternate #1

Alternate #2

Alternate #3

Schmidt Contracting, Inc.

$13,000.00

$6,000.00

$4,900.00

$3,000.00

Driving Force, LLC

$11,928.85

$7,330.00

$5,710.00

$4,300.00

T & J Holdings, Inc.

$15,600.00

$4,900.00

$5,750.00

$2,800.00

Clovis Construction, Inc.

$16,020.00

$5,590.00

$3,800.00

$4,400.00

N.B. Remodeling, LLC

No Bid

No Bid

No Bid

No Bid

Staff Estimate

$16,530.00

$5,485.00

$3,850.00

$2,550.00

 

The exterior work includes replacing the driveway, city sidewalk and installing a new homeowner sidewalk off the front deck. Electrical work to include installing GFCIs, ceiling fan boxes and a wiring repair in the garage. Interior work also includes baseboard installation, window repairs through-out the house and an interior door replacement. This project also includes the following alternates: Alternate #1 – Furnace and A/C Replacement; Alternate #2 – Window Replacement; Alternate #3 – Refinish Wood Floors.  Alternate #3 is not being accepted because it would take the total project above the program limit of $25,000. House was built in 1975 and lead hazards are not present.

 

Bid #B1248 – 3113 Creekwood Drive – Community Development Division

 

    

   B1248

 

Base Bid

Alternate #1

Alternate #2

T & J Holdings, Inc.

$13,550.00

$1,750.00

$3,500.00

Schmidt Contracting, Inc.

$14,150.00

$2,500.00

$4,500.00

Clovis Construction, Inc.

$16,292.00

$1,400.00

$5,000.00

Driving Force, LLC

$16,984.50

$1,220.00

$6,480.00

N.B. Remodeling, LLC

$17,420.00

$1,639.00

$4,430.00

Staff Estimate

$15,961.00

$2,000.00

$3,000.00

 

 

The exterior work includes replacing the driveway and homeowner sidewalk, an A/C replacement, some siding replacement, painting the trim and some minor carpentry items on the exterior.  Interior work includes replacing the furnace, installing a handrail and installing some GFCIs.  This project also includes two alternates: Alternate #1 – Overhead Garage Door Replacement; Alternate #2 – Painting the Exterior of the House. House was built in 1977 and lead hazards are not present.

 

 

Recommendation Action:

 

Approve bid from Schmidt Contracting, Inc. for 3012 Flint Drive in the amount of $13,000.00 for the Base Bid, $6,000.00 for Alternate #1 and $4,900.00 for Alternate #2.  Total contract price of $23,900.00.

 

Approve bid from T & J Holdings, Inc. for 3113 Creekwood Drive in the amount of $13,550.00 for the Base Bid, $1,750.00 for Alternate #1 and $3,500.00 for Alternate #2.  Total contract price of $18,800.00.

 

 

 

cc:      David L. Corliss                                    

          Bobbie Walthall                          

          Jonathan Douglass

          Alan Landis

          Scott McCullough

          Margene Swarts