City of Lawrence
Utilities Department
MEMORANDUM
TO: David L. Corliss - City Manager
Cynthia Wagner - Assistant City Manager
Diane Stoddard - Assistant City Manager
FROM: Bob Brower – Field Manager
CC: Dave Wagner - Director of Utilities
Mike Lawless – Asst. Director of Utilities
Philip Ciesielski- Asst. Director of Utilities
Mark Hegeman – Utilities Operations Superintendent
Alan Landis – Purchasing Specialist
DATE: July 17, 2012
RE: July 24, 2012 Agenda Item – Award Bid for Contractor Services for Emergency Sanitary Sewer, Force Main and Air Relief Valve Repairs
Please include the following item on the City Commission Agenda for consideration at the July 24, 2012 meeting:
Award Bid #B1240 for Contractor Services to Complete Emergency Sanitary Sewer, Force Main, and Air Relief Valve Repairs to Vito’s Plumbing and authorize the City Manager to execute a contract agreement.
Project Description
Collapsed sewer mains, severe sewer pipe fractures and other defects need immediate repair to prevent sanitary sewer overflows and backups into customer homes. The department averages 45 emergency repairs annually, which range in price from $3,000 to $14,000 per repair.
The bid is for emergency sanitary sewer repairs for one year from 8/01/12 through 08/01/13 with the option to renew that contract for an additional four one-year periods with the agreement of both parties. The current contract expires August 1, 2012.
On July 17, 2012, bids were received and opened from RD Johnson Excavating and Vito’s Plumbing (see attached). Vito’s Plumbing submitted the low unit bid pricing.
Project Funding
The work will be funded from the 2012 Operations and Maintenance budget for 501.7.7410.2538.
Action Request
Staff recommends award of Bid #B1240 for Contractor Services to Emergency Sanitary Sewer, Force Mains, and Air Relief Valve Repairs to Vito’s Plumbing.
Thank you for your assistance. Please advise if you have any questions.
Bid Tab:
Vito's Plumbing |
Cost per Hour |
Cost per Hour |
||
LABOR |
Regular Hours |
After Hours Sundays Only |
Materials/Parts Cost |
% over cost |
Employee 1 (supervisor) |
$ 52.50 |
$ 66.50 |
All Pipe |
10% |
Employee 2 (laborer) |
$ 35.50 |
$ 49.50 |
All Fittings |
10% |
Employee 3 (plumber) |
$ 62.00 |
$ 76.00 |
Flow-able Fill |
10% |
Employee 4 |
$ - |
$ - |
Concrete |
10% |
Employee 5 |
$ - |
$ - |
Asphalt |
10% |
|
|
|
Gravel |
10% |
Equipment Cost |
Regular Hours |
After Hours Sundays Only |
Dirt |
10% |
Back Hoe (rubber tire) |
$ 72.50 |
$ 86.50 |
Property Restoration |
% over cost |
Back Hoe with Hammer |
$ 104.00 |
$ 118.00 |
Fence |
10% |
Back Hoe with Compactor |
$ 94.00 |
$ 108.00 |
Silt Fence |
10% |
Excavator 331 |
$ 74.00 |
$ 88.00 |
Erosion Control |
10% |
Excavator 331 with Hammer |
$ 95.00 |
$ 109.00 |
Equipment |
10% |
Excavator 138 |
$ 104.00 |
$ 118.00 |
Sod |
10% |
Excavator 138 with Hammer |
$ 210.00 |
$ 224.00 |
Grass Seed |
10% |
Excavator 220 |
$ 126.00 |
$ 140.00 |
Fertilizer |
10% |
Excavator 220 with Hammer |
$ 252.00 |
$ 266.00 |
Straw and Blower |
10% |
Excavator 228 |
$ 126.00 |
$ 140.00 |
|
|
Excavator 228 with Hammer |
$ 252.00 |
$ 266.00 |
|
|
Excavator 300 |
$ 160.00 |
$ 174.00 |
|
|
Excavator 300 with Hammer |
$ 350.00 |
$ 364.00 |
|
|
Equipment Cost |
Regular Hours |
After Hours Sundays Only |
|
|
Dump Truck/Driver |
|
|
|
|
Single Axle |
$ 54.50 |
$ 68.50 |
|
|
Tandem Axle |
$ 70.00 |
$ 84.00 |
|
|
Triple Axle/Barrel |
$ 75.00 |
$ 89.00 |
|
|
End Dump |
$ 82.00 |
$ 96.00 |
|
|
6 Wheel Cat Cart |
$ 135.00 |
$ 149.00 |
|
|
Low Boy |
$ 95.00 |
$ 109.00 |
|
|
Water Truck/Water |
$ 75.00 |
$ 89.00 |
|
|
Other Equipment |
Regular Hours |
After Hours Sundays Only |
|
|
953 Loader/Rock |
$ 122.00 |
$ 136.00 |
|
|
963 Loader/Rock |
$ 132.00 |
$ 146.00 |
|
|
D-65 EX Dozer |
$ 140.00 |
$ 154.00 |
|
|
Track Skid Steer |
$ 80.00 |
$ 94.00 |
|
|
Bob Cat/Uni-loader |
$ 70.00 |
$ 84.00 |
|
|
180 Wheel Loader/ 3 yd |
$ 90.00 |
$ 104.00 |
|
|
250 Wheel Loader/ 4 yd |
$ 95.00 |
$ 109.00 |
|
|
By-Pass Pumps |
$ 35.00 |
$ 49.00 |
|
|
By-Pass Pumping Hose, Pipe, fittings |
$ 45.00 |
$ 59.00 |
|
|
Mobilization |
1 hour |
1 hour |
|
Bid Tab:
RD Johnson |
Cost per Hour |
Cost per Hour |
||
LABOR |
Regular Hours |
After Hours Sundays Only |
Materials/Parts Cost |
% over cost |
Employee 1 (supervisor) |
$ 55.00 |
$ 70.00 |
All Pipe |
15% |
Employee 2 (laborer) |
$ 40.00 |
$ 55.00 |
All Fittings |
15% |
Employee 3 (plumber) |
$ 64.00 |
$ 79.00 |
Flow-able Fill |
15% |
Employee 4 |
$ 40.00 |
$ 55.00 |
Concrete |
15% |
Employee 5 |
$ 40.00 |
$ 55.00 |
Asphalt |
15% |
|
|
|
Gravel |
15% |
Equipment Cost |
Regular Hours |
After Hours Sundays Only |
Dirt |
15% |
Back Hoe (rubber tire) |
$ 75.00 |
$ 90.00 |
Property Restoration |
% over cost |
Back Hoe with Hammer |
$ 105.00 |
$ 120.00 |
Fence |
15% |
Back Hoe with Compactor |
$ 95.00 |
$ 110.00 |
Silt Fence |
15% |
Excavator PC45 |
$ 75.00 |
$ 90.00 |
Erosion Control |
15% |
Excavator PC45 with Hammer |
$ 95.00 |
$ 110.00 |
Equipment |
15% |
Excavator 138 |
$ 105.00 |
$ 120.00 |
Sod |
15% |
Excavator 138 with Hammer |
$ 210.00 |
$ 225.00 |
Grass Seed |
15% |
Excavator 220 |
$ 126.00 |
$ 141.00 |
Fertilizer |
15% |
Excavator 220 with Hammer |
$ 252.00 |
$ 267.00 |
Straw and Blower |
15% |
Excavator 228 |
$ 126.00 |
$ 141.00 |
|
|
Excavator 228 with Hammer |
$ 252.00 |
$ 267.00 |
|
|
Excavator 300 |
$ 160.00 |
$ 175.00 |
|
|
Excavator 300 with Hammer |
$ 350.00 |
$ 365.00 |
|
|
Equipment Cost |
Regular Hours |
After Hours Sundays Only |
|
|
Dump Truck/Driver |
|
|
|
|
Single Axle |
$ 55.00 |
$ 70.00 |
|
|
Tandem Axle |
$ 70.00 |
$ 85.00 |
|
|
Triple Axle/Barrel |
$ 75.50 |
$ 90.50 |
|
|
End Dump |
$ 83.50 |
$ 98.50 |
|
|
6 Wheel Cat Cart |
$ 135.00 |
$ 150.00 |
|
|
Low Boy |
$ 95.00 |
$ 110.00 |
|
|
Water Truck/Water |
$ 75.00 |
$ 90.00 |
|
|
Other Equipment |
Regular Hours |
After Hours Sundays Only |
|
|
953 Loader/Rock |
$ 122.00 |
$ 137.00 |
|
|
963 Loader/Rock |
$ 132.00 |
$ 147.00 |
|
|
D-65 EX Dozer |
$ 140.00 |
$ 155.00 |
|
|
Track Skid Steer |
$ 80.00 |
$ 95.00 |
|
|
Bob Cat/Uni-loader |
$ 70.00 |
$ 85.00 |
|
|
180 Wheel Loader/ 3 yd |
$ 90.00 |
$ 105.00 |
|
|
250 Wheel Loader/ 4 yd |
$ 95.00 |
$ 110.00 |
|
|
By-Pass Pumps |
$ 35.00 |
$ 50.00 |
|
|
By-Pass Pumping Hose, Pipe, fittings |
$ 45.00 |
$ 60.00 |
|
|
Mobilization |
1 hour |
1 hour |
|