RE:                  July 24, 2012 Agenda Item – Award Bid for Contractor Services for Emergency Sanitary Sewer, Force Main and Air Relief Valve Repairs

 

Please include the following item on the City Commission Agenda for consideration at the July 24, 2012 meeting:

 

Award Bid #B1240 for Contractor Services to Complete Emergency Sanitary Sewer, Force Main, and Air Relief Valve Repairs to Vito’s Plumbing and authorize the City Manager to execute a contract agreement.

 

Project Description

Collapsed sewer mains, severe sewer pipe fractures and other defects need immediate repair to prevent sanitary sewer overflows and backups into customer homes. The department averages 45 emergency repairs annually, which range in price from $3,000 to $14,000 per repair.

 

The bid is for emergency sanitary sewer repairs for one year from 8/01/12 through 08/01/13 with the option to renew that contract for an additional four one-year periods with the agreement of both parties. The current contract expires August 1, 2012.

 

On July 17, 2012, bids were received and opened from RD Johnson Excavating and Vito’s Plumbing (see attached). Vito’s Plumbing submitted the low unit bid pricing.

 

Project Funding

The work will be funded from the 2012 Operations and Maintenance budget for 501.7.7410.2538.

 

Action Request

Staff recommends award of Bid #B1240 for Contractor Services to Emergency Sanitary Sewer, Force Mains, and Air Relief Valve Repairs to Vito’s Plumbing.

 

Thank you for your assistance.  Please advise if you have any questions.

Bid Tab:

Vito's Plumbing

 Cost per Hour

 Cost per Hour

LABOR

 Regular Hours

 After Hours Sundays Only

Materials/Parts Cost

% over cost

Employee 1 (supervisor)

 $         52.50

 $        66.50

All Pipe

10%

Employee 2 (laborer)

 $         35.50

 $        49.50

All Fittings

10%

Employee 3 (plumber)

 $         62.00

 $        76.00

Flow-able Fill

10%

Employee 4

 $              -  

 $             -  

Concrete

10%

Employee 5

 $              -  

 $             -  

Asphalt

10%

 

 

 

Gravel

10%

Equipment Cost

 Regular Hours

 After Hours Sundays Only

Dirt

10%

Back Hoe (rubber tire)

 $         72.50

 $        86.50

Property Restoration

% over cost

Back Hoe with  Hammer

 $       104.00

 $      118.00

Fence

10%

Back Hoe with  Compactor

 $         94.00

 $      108.00

Silt Fence

10%

Excavator 331     

 $         74.00

 $        88.00

Erosion Control

10%

Excavator 331 with Hammer

 $         95.00

 $      109.00

Equipment

10%

Excavator 138    

 $       104.00

 $      118.00

Sod

10%

Excavator 138 with Hammer

 $       210.00

 $      224.00

Grass Seed

10%

Excavator 220

 $       126.00

 $      140.00

Fertilizer

10%

Excavator 220 with Hammer

 $       252.00

 $      266.00

Straw and Blower

10%

Excavator 228

 $       126.00

 $      140.00

 

Excavator 228 with Hammer

 $       252.00

 $      266.00

 

Excavator 300

 $       160.00

 $      174.00

 

Excavator 300 with Hammer

 $       350.00

 $      364.00

 

Equipment Cost

 Regular Hours

 After Hours Sundays Only

 

Dump Truck/Driver

 

 

 

Single Axle

 $         54.50

 $        68.50

 

Tandem Axle

 $         70.00

 $        84.00

 

Triple Axle/Barrel   

 $         75.00

 $        89.00

 

End Dump

 $         82.00

 $        96.00

 

6 Wheel Cat Cart   

 $       135.00

 $      149.00

 

Low Boy

 $         95.00

 $      109.00

 

Water Truck/Water

 $         75.00

 $        89.00

 

Other Equipment

 Regular Hours

 After Hours Sundays Only

 

953 Loader/Rock

 $       122.00

 $      136.00

 

963 Loader/Rock

 $       132.00

 $      146.00

 

D-65 EX Dozer

 $       140.00

 $      154.00

 

Track Skid Steer

 $         80.00

 $        94.00

 

Bob Cat/Uni-loader

 $         70.00

 $        84.00

 

180 Wheel Loader/   3 yd

 $         90.00

 $      104.00

 

250 Wheel Loader/   4 yd

 $         95.00

 $      109.00

 

By-Pass Pumps

 $         35.00

 $        49.00

 

By-Pass Pumping Hose, Pipe, fittings

 $         45.00

 $        59.00

 

Mobilization

 1 hour

 1 hour

 

 

 

Bid Tab:

RD Johnson

 Cost per Hour

 Cost per Hour

LABOR

 Regular Hours

 After Hours Sundays Only

Materials/Parts Cost

% over cost

Employee 1 (supervisor)

 $         55.00

 $         70.00

All Pipe

15%

Employee 2 (laborer)

 $         40.00

 $         55.00

All Fittings

15%

Employee 3 (plumber)

 $         64.00

 $         79.00

Flow-able Fill

15%

Employee 4

 $         40.00

 $         55.00

Concrete

15%

Employee 5

 $         40.00

 $         55.00

Asphalt

15%

 

 

 

Gravel

15%

Equipment Cost

 Regular Hours

 After Hours Sundays Only

Dirt

15%

Back Hoe (rubber tire)

 $         75.00

 $         90.00

Property Restoration

% over cost

Back Hoe with  Hammer

 $       105.00

 $       120.00

Fence

15%

Back Hoe with  Compactor

 $         95.00

 $       110.00

Silt Fence

15%

Excavator PC45    

 $         75.00

 $         90.00

Erosion Control

15%

Excavator PC45 with Hammer

 $         95.00

 $       110.00

Equipment

15%

Excavator 138    

 $       105.00

 $       120.00

Sod

15%

Excavator 138 with Hammer

 $       210.00

 $       225.00

Grass Seed

15%

Excavator 220

 $       126.00

 $       141.00

Fertilizer

15%

Excavator 220 with Hammer

 $       252.00

 $       267.00

Straw and Blower

15%

Excavator 228

 $       126.00

 $       141.00

 

Excavator 228 with Hammer

 $       252.00

 $       267.00

 

Excavator 300

 $       160.00

 $       175.00

 

Excavator 300 with Hammer

 $       350.00

 $       365.00

 

Equipment Cost

 Regular Hours

 After Hours Sundays Only

 

Dump Truck/Driver

 

 

 

Single Axle

 $         55.00

 $         70.00

 

Tandem Axle

 $         70.00

 $         85.00

 

Triple Axle/Barrel   

 $         75.50

 $         90.50

 

End Dump

 $         83.50

 $         98.50

 

6 Wheel Cat Cart   

 $       135.00

 $       150.00

 

Low Boy

 $         95.00

 $       110.00

 

Water Truck/Water

 $         75.00

 $         90.00

 

Other Equipment

 Regular Hours

 After Hours Sundays Only

 

953 Loader/Rock

 $       122.00

 $       137.00

 

963 Loader/Rock

 $       132.00

 $       147.00

 

D-65 EX Dozer

 $       140.00

 $       155.00

 

Track Skid Steer

 $         80.00

 $         95.00

 

Bob Cat/Uni-loader

 $         70.00

 $         85.00

 

180 Wheel Loader/   3 yd

 $         90.00

 $       105.00

 

250 Wheel Loader/   4 yd

 $         95.00

 $       110.00

 

By-Pass Pumps

 $         35.00

 $         50.00

 

By-Pass Pumping Hose, Pipe, fittings

 $         45.00

 $         60.00

 

Mobilization

 1 hour

 1 hour