Memorandum

City of Lawrence

Public Works

 

TO:

David L. Corliss, City Manager

FROM:

Nick Voss, Project Engineer

CC:

Cynthia Wagner, Diane Stoddard, Chuck Soules, Shoeb Uddin, Mark Thiel

Date:

February 21, 2012

RE:

Award of City Bid No: B1214 Project PW1126: Delaware Street, 8th to 9th (Section 1) and Poehler Parking Lot (Section 2)

 

Please include the following item on the City Commission Agenda for consideration at the February 28, 2012 meeting.

 

On February 21, 2012 the City of Lawrence opened proposals for the following:  

 

Project PW1126 – City Bid No. B1214

Delaware Street, 8th to 9th (Section 1) and Poehler Parking Lot (Section 2)

 

VENDOR

TOTAL

Engineers' Estimate

$1,144,008.34

Kings' Excavating

$809,061.40

Kansas Heavy

$912,459.30

R.D. Johnson

$829,333.00

 

Project Description

The project includes two sections.  Section one includes extending Delaware from 8th to 9th Street.  Storm sewer, angled parking, landscaping, pedestrian lighting, and waterline improvements are to be made.  Reconstruction of the Northern half of the alley in the 800 block between Delaware and Pennsylvania is also included.  Section two includes a parking lot for the Poehler building including pavement, storm sewer, parking lot lighting, and landscaping.  Construction is anticipated to begin in late March with a “substantial completion” date of June 30, 2012.

 

Project Cost/Funding

The total cost of this project is within the available funds/budget (approved by the City Commission) for these improvements.

 

To ensure timely completion of the project, staff already received bids (approved by the city commission on 02/21/12) for storm water pipes and inlet structures – these concrete items typically have 4 to 6 weeks of delivery lag time. The intent is to have these materials available so the contractor can proceed with the project without any delay. Staff is also in the process of procuring the lighting fixtures appropriate for Historic Industrial District.

 

 

Project Cost

Amount

Kings' Excavating

$809,061.40

Storm Sewer pipes and structures (materials only, bid approved by City Commission on 02/21/12)

$99,625.00

Lighting Fixtures (for materials only and cost is estimated, staff is in the process of procuring these materials)

$50,000.00

Total Project Cost

$958,686.40

 

 

Break-down of Project Costs and Funding

Items

Cost

Funding  source

Funding Break-down

Other expenses

Delaware Street Parking Lot and Alley (including lighting and landscaping)

$135,284.80

 

GO Bonds (Res. 6937 - 205,000) and 2012 Street Maintenance Funds

$135,284.80 from GO Bonds

Lighting

Estimate $10,000

Delaware Street Improvements (Road, parking, storm water from 8th to 9th) + storm water from Pennsylvania to Delaware

$550,914.60

 

GO Bonds (Res 6941 - $750,000) + storm water funds

$315,539.60 from GO Bonds plus

$235,375 from Storm water funds

Total: $550,914.60

Lighting estimated @ $40,000

 

Engineering $55,000

 

Storm Sewer Materials $99,625

Water Line (along Delaware street between 8th and 9th Street)

$109,692

Non-bonded Construction, Utilities

$109,692 from non-bonded construction, Utilites

 

Fire Sprinkler for Poehler Building (up to 75% of actual costs, not to exceed $85,000)

N/A

General Funds

 

 

8th Street Improvements (overlay, angled parking, curb repair, bulb outs, lighting)

$13,170

2012 Street Maintenance Funds

$13,170 from 2012 Street Maintenance funds

 

Utility Connections to the Poehler Building, including Domestic water, fire line and Sanitary Sewer

N/A

Part of Delaware Street Improvements

 

 

Total

$809,061.40

 

$809,061.40

 

 

 

 

 

Bid Evaluation / Recommendation

Staff has evaluated all bid proposals to check for accuracy, completeness and other applicable criteria / requirements. As shown in the Summary Table, the bid proposal from Kings' Excavating offers the “lowest responsive” total bid price for this project. Staff recommends Award of City Bid No. B1214 to Kings' Excavating (see attached bid tab).

 

Action Request

Approve bid from Kings' Construction for Project PW1126, Delaware Street, 8th to 9th Street and Poehler Parking Lot in the amount of $809,061.40 provided the contractor can meet the terms established in the contract documents.